• Advise the client as to his responsibilities under CDM regulations 2015
  • Ensure the designer has understood the risks in the design by designing out risks as far as practicable
  • Ensure that pre- construction information is obtained from the client to make available to prospective contractors tendering for the work
  • Vet prospective contractors for the client, so as to assure the client of their competence
  • Assure the client that the principal contractor has raised a suitable construction phase plan prior to the start of the project
  • Assure the client that the welfare facilities are adequate for workers prior to the start of the project
  • Attend design meetings during the construction phase to ensure that risks are being managed satisfactorily, and advise the client accordingly
  • Arrange for a Health and Safety File to be compiled and passed to the client at the end of the project

Under the Construction Design and Management Regulations 2015